Activity
From 25.04.2017 to 24.05.2017
09.05.2017
- 14:31 Task #4206 (Closed): HMM-based outlier duration detection and penalization
- Penalize units with duration different from HMM-based predicted value.
- 14:30 Task #4205 (Closed): DNN-based outlier duration detection and penalization
- Penalize units with duration different from DNN-based predicted value.
Also available in: Atom